Seven construction processes of steel structure workshop

Time:[2021-11-13]  Hits:2361

The main process flow of steel structure plant construction is as follows:

1. Construction setting out. According to the design requirements and drawing requirements, use theodolite and level for positioning. After determining the axis and elevation, confirm the position of steel frame footing.

2. Foundation embedded parts. Before foundation concrete pouring, the embedded bolts shall be fixed according to the size, and the embedded bolts shall be wrapped in advance to avoid pollution during concrete pouring. After the completion of concrete pouring, the concrete residue at the embedded anchor rod and screw port shall be cleaned in time.

3. Steel column hoisting. First, confirm the position of component lifting points and take protective measures. After lifting the steel column, align it close to the anchor bolt, align the mounting hole with the bolt, and then slowly put down the hook. After initial calibration, tighten the bolts.

4. Steel beam installation. After the steel column is rechecked, the steel beam shall be lifted and bound symmetrically at two points. When the datum face of steel beam and steel column is on time, butt joint adjustment and correction shall be carried out, and then fixed and connected.

5. Purlin installation. The purlin generally adopts the method of one hook and multiple lifting. The error is adjusted by moving the sample bar back and forth along the purlin, tightening and loosening the bolts, and finally fixed with bolts for correction.

6. Install wallboard. Start at the gable at one end and move on to the other. At the initial stage of construction, the operation platform shall be used for transition to ensure that the top plate is parallel and installed vertically through stay wire. It is best to form at one time and handle it with care to avoid scratching.

7. Workshop painting. First remove the stains on the metal surface, and then apply antirust paint. After the antirust paint is dry, start puttying. After the putty is completely dry, it shall be polished and leveled. Finally, apply anti phosphating primer.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 韩国免费a级毛片 | 免费不卡视频 | 国产免费小视频在线观看 | 国产精品三级 | 99热在这里只有免费精品 | 久久久久逼 | 善良朋友的妻子在线观看 | 国产aⅴ一区二区三区 | 在线观看国产免费高清不卡 | 亚洲男人在线天堂 | 99热这里只有精品9 99热这里只有精品88 | 精品福利一区3d动漫 | 99re8在线这里只有精品 | 欧美日韩一区二区在线观看 | 国产精品动漫视频网站 | 久久精品国产在热久久2019 | 中文字幕日韩在线 | 亚洲骚色 | 99久久久久国产 | 97精品免费视频 | 欧美成人看片一区二区三区 | 久久精品国产亚洲香蕉 | 91在线播放免费不卡无毒 | 日本高清视频免费看 | 八戒八戒看片在线观看网 | 高清欧美一区二区三区 | 91精品国产91久久久久 | 久久久国产精品免费看 | 五月天婷婷精品视频 | 亚洲免费网站在线观看 | 四虎久久影院 | 国产福利区一区二在线观看 | 91人前露出精品国产 | 永久免费91桃色福利 | 这里都是精品 | 亚洲国产香蕉视频欧美 | 91三级视频 | 婷婷色在线视频 | 国产精品黄网站免费进入 | 黄页视频在线观看免费 | 亚洲 欧洲 另类 综合 自拍 |