Steel structure warehouse hoisting process and hoisting plan-Chapter 1

Time:[2021-9-25]  Hits:3056

Hoisting process

 

Positioning --- Calibration Height --- Column Top Bolt Embedded --- Calibration Height - Elastic Line - Column Installation - Steel Beam Installation - Secondary Structure Installation --- --Welding----Repainting----Completion

 

 

Steel column installation process


A,Lifting of steel columns

 

1.Re-test the foundation, including the exposed length of the anchor bolt, the displacement deviation of the anchor bolt center line to the reference line, the distance between the anchor bolts, and the foundation elevation. The unqualified ones can be handled before lifting.

 

2.In order to control the installation elevation of the column, a 500mm position is also marked on the visible cross section of the column in advance for fine-tuning and correction of the elevation during installation. Install the steel column on the basis of qualified retest, first tie the column with a single steel wire rope, and choose the position of the lifting point at a position 1/3 of the length of the column from the end of the column. The column is lifted by the rotation method, and the steel column is lifted and sent to the installation position. The lashing place should be padded.

 

 

B, the correction of the steel column

 

1.Draw the center line in advance on the visible surface of the column, and then use the theodolite to adjust the verticality of the column in two mutually perpendicular directions.

 

2.Control the verticality of the column by measuring the distance between the inner side of the column and the control line on the building.

 

3.The adjustment of the elevation, axis and verticality deviation of the column are related to each other, and the correction work will be completed when all the standards are met.

 

 

Steel beam installation process

 

Unload the steel beams to the vicinity of each column, hoist them to the floor with a car, and then install them by mast cranes. The main beams with some heavy components can be platform craned with car cranes. The secondary beam can be installed with a self-made wheeled crane (5t). Starting from the third zone, the main girder, the secondary girder and then the purlin, the steel girder shall be hoisted by masts one by one according to the number. Only when the two ends of the girder are fastened with bolts (or spot welded firmly), the hooks can be loosened and the others are hoisted in sequence Steel beams. Weld after passing the inspection.
The lashing and hoisting points of steel beams are particularly important. Steel poles can be used when the steel beams are too long. There are many steel beams in this project with a maximum length of about 20m. A triangular hanging plate is used to enlarge the distance between the steel ropes to increase the angle of the steel ropes. Require. Schematic diagram of steel beam lashing.

 


Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 亚洲欧美综合在线观看 | 欧美在线va在线播放 | 国产高清一区二区三区四区 | 香港三级日本三级三级人妇99 | 天天干天天射天天操 | 国产免费久久精品99 | 久久视精品 | 亚洲欧美国产精品专区久久 | 国产精品成人观看视频网站 | 99热精品久久只有精品30 | 99视频在线永久免费观看 | 日韩高清在线高清免费 | 国产精品久久久久久久久久妇女 | 亚洲区免费 | 日本精品在线观看 | 亚洲欧美日韩在线 | 97在线观看成人免费视频 | 亚洲 欧美 日韩在线一区 | 天天干天天操天天射 | 四虎黄网| 男女性高爱麻豆 | 国产区精品一区二区不卡中文 | 成人黄网大全在线观看 | 中文字幕一区二区三区久久网站 | 亚洲三级欧美 | 最新sss华人 | 欧美国产小视频 | 成品人app软件大全免费下载 | 日本高清黄色网站 | 老师的小兔子好大好软水好多视频 | 99精品一区二区三区 | 国产伦理久久精品久久久久 | 自拍偷拍第一页 | 五月天综合社区 | 啦啦啦在线观看视频免费观看4 | 欧美一级做性受 | 欧美一区二区三区在线播放 | 麻豆免费传媒视频在线 | 久久99精品亚洲热综合 | 国产亚洲综合精品一区二区三区 | 精品一区二区三区四区五区 |