日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > During the installation of steel structure, the following problems shall be paid attention to:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sowiz.com.cn

During the installation of steel structure, the following problems shall be paid attention to:

Time:[2021-8-28]  Hits:2962

During the installation of steel structure, the following problems shall be paid attention to:

1. Before the installation of steel structure, all members shall be comprehensively inspected, such as whether the number, length, perpendicularity of members and the size between bolt holes at installation nodes meet the design requirements; The defects generated during fabrication and deformation generated during transportation shall be corrected on the ground and properly solved.

2. The steel column and foundation are generally connected by embedded anchor bolts. Therefore, before installing the steel column, check the size between the column base bolts, whether the length exposed to the foundation surface, the elevation of the foundation top meet the design requirements, and whether the thread of the column base anchor bolt is damaged (generally, measures are taken during foundation construction to protect the column base anchor bolt and its thread from being damaged).

3. When hoisting the steel structure, proper measures shall be taken to prevent excessive bending and torsion deformation. The contact part between the rope buckle and the component shall be padded with cushion blocks to prevent the component from being damaged.

4. After the steel structure is hoisted in place, the support and other connecting members shall be fastened in time to ensure the stability of the structure.

5. The hoisting of all superstructure can only be carried out after the substructure is in place, corrected and fastened with supporting members.

6. Assemble a large installation unit on the ground according to the lifting capacity of the site installation machinery to reduce the workload of high-altitude operation.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日韩一级片免费在线观看 | 久久久久性 | 国产精品黄大片在线播放 | 欧美精品一区二区三区免费播放 | 国产免费一区二区三区在线观看 | 男人扒开女人下狂躁视频 | 天堂网在线看 | 日本高清不卡一区 | 日韩欧美一区二区三区免费看 | 亚洲成年人专区 | 久久精品国产福利国产秒 | 91蜜桃麻豆 | 热99re久久精品天堂vr | 欧美成人777 | 成年女人视频播放免费观看 | 国产精品玖玖玖在线观看 | 思久久| 免费毛片网站在线观看 | 手机在线观看精品国产片 | 天天上天天操 | 色老头成人免费视频天天综合 | 国产成人尤物精品一区 | 亚洲一页 | 国内精品七七久久影院 | 在线不卡一区二区三区日韩 | 日本精品在线观看视频 | 亚洲欧美日韩另类在线 | 欧美日b片| 国产真实伦对白在线播放 | 午夜免费观看_视频在线观看 | 五月婷婷在线观看视频 | 免费黄色在线观看 | 91久久精品国产一区二区 | 男女羞羞的视频网站在线观看 | 高清亚洲综合色成在线播放放 | 台湾在线视频 | 亚洲精品午夜国产va久久 | 成人国产午夜在线视频 | 亚洲手机在线手机观看高清hd | 欧美视频精品在线 | 亚洲综合亚洲综合网成人 |