日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > Common problems of Foshan steel structure column base installation
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sowiz.com.cn

Common problems of Foshan steel structure column base installation

Time:[2021-4-7]  Hits:3130

Installation of column base

 

(1) Embedded parts (anchor bolt) problems: overall or layout deviation; elevation error; screw thread without protective measures. The bolt holes on the bottom plate of the steel column are directly out of alignment, resulting in insufficient thread length.

 

Measures: the steel structure construction unit cooperates with the civil construction unit to complete the embedded parts work, before the concrete pouring and tamping. Relevant dimensions must be rechecked and fixed firmly.

 

(2) The phenomenon of anchor bolt not vertical: the horizontal degree of the base plate of frame column column foot is poor, the anchor bolt is not vertical, and the horizontal error of embedded anchor bolt is too large after foundation construction. The columns are not in a straight line after installation, which makes the appearance of the house difficult to see, brings errors to the steel column installation, and affects the structural stress, which does not meet the requirements of the construction acceptance specification.

 

Measures: the anchor bolt installation should adhere to the bottom plate leveling with the lower adjustment bolt, and then the secondary grouting of non shrinkage mortar, and the construction method abroad. Therefore, during the construction of anchor bolt, steel bar or angle steel can be used to fix anchor bolt. Welding into a cage, improving the support, or taking some other effective measures to avoid the anchor bolt moving one place when pouring the foundation concrete.

 

(3) Anchor bolt connection problems: the anchor bolt of column base is not tightened, the base plate is not welded with the bottom plate; some anchor bolts with 2-3 threads are not exposed.

 

Measures: Welding bolts and nuts shall be adopted; outside chemical anchor bolts, fire-proof coating and heat insulation treatment shall be added to prevent the anchorage performance from being affected by fire; observation data of foundation settlement shall be supplemented.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 青青草国产在线 | 在线看欧美成人中文字幕视频 | 亚洲精品第一卡2卡3卡4卡5卡 | 曰本毛片 | 久久这里只有精品国产 | 艹黑丝| 亚洲国产精品免费在线观看 | 五月天婷婷在线播放 | 在线欧美a | 免费岛国| 国产精品视频免费看 | 日日舔 | 91xvip| 特级黄aaaaaaaaa毛片 | 久操伊人| 成年人免费在线视频 | 精品中文字幕一区二区三区四区 | 91国语精品自产拍在线观看一 | 免费黄色在线观看 | 91九色在线播放 | 中文字幕一区精品欧美 | 五月天婷婷基地 | 91av视频在线免费观看 | 妖精视频国产精品 | 午夜视频在线观看www中文 | 在线看片a免费人成漫画 | 午夜影剧院 | 亚洲天堂在线视频观看 | 欧美三区在线 | 亚洲视频在线观看网站 | 中文字幕日韩一区二区不卡 | 婷婷日韩 | 99这里只有精品66视频 | 久热精品6| 国产黄在线免费观看 | 日本精品久久久久中文字幕8 | 国产午夜一级淫片 | 色六月婷婷 | 亚洲欧洲一区二区三区在线观看 | 碰操| 九九热国产在线 |