Project cost control for wholesale metal building systems

Time:[2020-10-24]  Hits:3354

Different structural systems, peace, and facade layout have obvious effects on the project cost. In the design stage, only by determining the reasonable layout and facade layout and structural system according to the functional requirements of the building can the project cost be effectively controlled and economically applicable.

 

 

The design of the steel structure of the portal frame steel structure also has the economic span and the optimal spacing of the frame. When the process requirements allow, it is more economical to choose a small-span portal frame. Under normal circumstances, the optimal spacing of portal frames is 6m-9m. When large-tonnage cranes are installed, the economical column spacing is generally 7m-9m. It should not exceed 9m. When it exceeds 9m, roof purlins, crane beams and wall frames The amount of steel used in the system will increase accordingly, and the cost is not economical.

 

 

In the multi- and high-rise steel structures, the engineering volume of the floor structure system occupies a large proportion, which has an important influence on the work performance and cost of the structure. When determining the floor structure plan, the main consideration is to ensure that the floor slab has sufficient plane overall rigidity, which can reduce the weight of the structure and reduce the height of the structure layer, which is conducive to convenient on-site installation and rapid construction, and better fire protection and sound insulation Performance, and easy to lay the pipeline. Common floor slab practices include: profiled steel plate composite floor slab, prefabricated floor slab, laminated floor slab and ordinary cast-in-place reinforced concrete floor slab. At present, the most commonly used methods are profiled steel composite floor slabs and ordinary cast-in-place reinforced concrete slabs. When using these two methods, considering the combination of cast-in-situ slab and steel beam to form a combined beam that bears the common force, the height of the steel beam can be effectively reduced and more steel can be saved.

 

 

In the high-rise steel structure, the frame column adopts the circular steel tube concrete column, and the beams and slabs adopt the steel-concrete composite structure. The total steel consumption is greatly reduced compared with the ordinary steel structure, which can effectively reduce the project cost.

 

The advantages of steel structure construction determine that it will have strong vitality. In the design stage, technological innovation, material selection, and design optimization are the key stages for controlling construction costs and promoting the industrialization of building steel structures.

 

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 手机看片1204国内基地在线 | 丁香综合缴情六月婷婷 | 国产国语在线播放视频 | 狠狠色依依成人婷婷九月 | 一区在线视频 | 国产在线91精品 | 一区二区三区在线免费看 | 精品精品国产欧美在线观看 | 日本高清在线观看视频www | 日韩有码第一页 | 两个人的视频在线观看免费完整版 | 影音先锋色先锋女同另类 | 亚洲免费一区 | 国产日韩在线 | 99福利| 天天操2021 | 中文字幕欧美在线 | 国内不卡一二三四区 | 国产一卡2卡3卡4卡公司在线 | 亚洲视频在线视频 | 成人影院app| 亚洲黄色激情网 | 手机在线看片不卡中文字幕 | 99re免费视频精品全部 | 青青青草国产线观 | 国产在线乱码在线视频 | 午夜网页| 欧美视频大全 | 日韩簧片 | 九九综合九九综合 | 欧美在线播放一区二区 | 色婷婷亚洲综合 | 欧美日韩精品乱国产 | 日韩毛片大全免费高清 | 国产三级精品三级在线观看 | 国产门事件 | 欧美不卡视频在线观看 | 一级毛片不卡片免费观看 | 日韩小视频在线 | 九九热九九热 | www.av88|