日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > Project cost control for wholesale metal building systems
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sowiz.com.cn

Project cost control for wholesale metal building systems

Time:[2020-10-24]  Hits:3550

Different structural systems, peace, and facade layout have obvious effects on the project cost. In the design stage, only by determining the reasonable layout and facade layout and structural system according to the functional requirements of the building can the project cost be effectively controlled and economically applicable.

 

 

The design of the steel structure of the portal frame steel structure also has the economic span and the optimal spacing of the frame. When the process requirements allow, it is more economical to choose a small-span portal frame. Under normal circumstances, the optimal spacing of portal frames is 6m-9m. When large-tonnage cranes are installed, the economical column spacing is generally 7m-9m. It should not exceed 9m. When it exceeds 9m, roof purlins, crane beams and wall frames The amount of steel used in the system will increase accordingly, and the cost is not economical.

 

 

In the multi- and high-rise steel structures, the engineering volume of the floor structure system occupies a large proportion, which has an important influence on the work performance and cost of the structure. When determining the floor structure plan, the main consideration is to ensure that the floor slab has sufficient plane overall rigidity, which can reduce the weight of the structure and reduce the height of the structure layer, which is conducive to convenient on-site installation and rapid construction, and better fire protection and sound insulation Performance, and easy to lay the pipeline. Common floor slab practices include: profiled steel plate composite floor slab, prefabricated floor slab, laminated floor slab and ordinary cast-in-place reinforced concrete floor slab. At present, the most commonly used methods are profiled steel composite floor slabs and ordinary cast-in-place reinforced concrete slabs. When using these two methods, considering the combination of cast-in-situ slab and steel beam to form a combined beam that bears the common force, the height of the steel beam can be effectively reduced and more steel can be saved.

 

 

In the high-rise steel structure, the frame column adopts the circular steel tube concrete column, and the beams and slabs adopt the steel-concrete composite structure. The total steel consumption is greatly reduced compared with the ordinary steel structure, which can effectively reduce the project cost.

 

The advantages of steel structure construction determine that it will have strong vitality. In the design stage, technological innovation, material selection, and design optimization are the key stages for controlling construction costs and promoting the industrialization of building steel structures.

 

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 第四色网页 | 国产日韩精品一区二区三区 | 精品无人区乱码在线观看 | 久久精品视频大全 | 这里都是精品 | 禁网站在线观看免费视频 | 欧美伊人久久综合网 | 日韩欧美一区二区三区免费观看 | 国产精品国产精品国产专区不卡 | 国产精品日本欧美一区二区 | 欧美成人一区二区 | 亚洲欧美在线观看 | 欧美日韩一区二区三区色综合 | 欧美日韩一区在线观看 | 亚洲资源在线播放 | 四虎影视884a精品国产四虎 | 国产中文字幕在线观看 | 亚洲国产欧美日韩 | 黄视频网站免费观看 | 国产中日韩一区二区三区 | 99久久精彩视频 | 久久九九99热这里只有精品 | 欧美成人一区亚洲一区 | 欧美日韩一区二区不卡 | 女人18毛片特级一级免费视频 | 欧美在线完整高清观看 | 永久在线观看www免费视频 | 四虎成人免费观看在线网址 | 中文字幕日本亚洲欧美不卡 | 国产成人青青热久免费精品 | 四虎影院中文字幕 | 亚洲国产天堂久久综合226 | 不卡视频在线播放 | 四虎亚洲精品 | 天堂网在线最新版官网 | 久久99蜜桃精品久久久久小说 | 国产伦精品一区三区视频 | 精品久久免费观看 | 亚洲热视频 | 一级毛片免费视频 | 欧美性生大片免费观看 |