Foshan three steel steel truss construction method

Time:[2016-6-11]  Hits:5164

A high-altitude assembly method
Steel truss assembly method by high-altitude installation, erection is first assembled bracket design position, and then use a crane to grid member sub-element (or block) to the design position hanging in the air, were assembled on the bracket. Sometimes this method does not need large-scale lifting equipment, but the bracket assembly large amount of aerial work more. Therefore, the high strength for steel pipe truss with steel production of steel truss or bolt ball node is more appropriate, there are still a number of steel truss construction method has been applied.

Second, the overall installation method
Overall installation method is to first grid on the ground assembled into a whole, and then lifting equipment designed to enhance its overall position to be fixed. This method of construction without assembling the bracket tall, aerial less easy to ensure the welding quality, but requires a large crane lifting equipment, technology is more complex. Therefore, this method of spherical joints steel grid (especially three-grid and other bars more grid) is more appropriate. Depending on the equipment used, the overall installation method is divided into multi-machine Hoisting method, pull the lever to enhance the law, law and jack lifting jack lifting method.

Third, the high-altitude sliding method
In recent years, the use of aerial roof truss construction by parallel sliding gradually increased, it is especially suitable for theaters, auditoriums and other projects. This method of construction, the grid assembly platforms are situated in the building lobby top plate assembly (erection can be assembled on the platform assembly auditorium bleachers), to be the first assembly unit (or first stage) assembly is completed, it is about to fall on the sliding track, traction equipment from sliding forward a certain distance. Then assembled on the platform of the second assembly units (or second), after a good fight, together with the first assembly unit (or first stage) with slip forward, so ask before slipping constantly assembled piecemeal, until the entire grid assembly is completed and moved to place the slide position.

Good slip assembly grid, the grid can be set up under the carriage wheel, the roller slide on the slide rail; also in the grid holder under the seat bottom, so embedded in the bearing plate along the reinforced concrete frame beam embedded steel slide.
Slip grid or lever hoist winch available traction. According to the lever bearing capacity and traction grid size between supports, may be one or more points of traction. When the grid slip ends sync value should not exceed 50mm.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 精品久久久久久国产牛牛app | 欧美日韩精品一区二区在线线 | 日本中文字幕不卡在线一区二区 | 成 人 色综合 | 国产亚洲一区在线 | 一二三四视频社区5在线高清视频 | 日本一区二区三区在线播放 | 欧美一区二区三区在线观看 | 人与动性欧美 | 国自产在线精品免费 | 欧洲免费在线视频 | 国产精品不卡在线 | 亚洲日韩天堂 | 91久久精品一区二区三区 | 在线精品视频在线观看高清 | 麻豆日批| 国产精品 视频一区 二区三区 | 国产九九视频在线观看 | 成人在线一区二区 | 啦啦啦社区手机在线视频免费视频 | 欧美日韩一区二区三区免费 | 不卡网 | 国产中文字幕第一页 | 国外成人免费视频 | 国产精品1区 | 麻豆果冻 | 日本影院在线观看 | 成人精品久久 | 酒色激情网 | 天堂看动漫 | 精品一区二区三区在线观看视频 | 亚洲综合激情六月婷婷在线观看 | 日本亚洲国产精品久久 | 两个人的视频免费 | 91四虎国自产在线播放线 | 国产精品一区二区三区四区 | 日韩国产精品欧美一区二区 | 久久精品欧美一区二区 | 国产精品xxxav免费视频 | 欧美亚洲国产片在线观看 | 四虎影视在线永久免费看黄 |