raw materials and finished steel structure approach

Time:[2016-1-23]  Hits:5115

Guangzhou Steel tells you: raw materials and finished steel structure approach

(1) Guangzhou Steel Engineering steel materials used should be consistent with the design documents and the relevant existing standards, and have quality certification document, the admission after passing inspection before using.
(2) site acceptance steel, in addition to compliance with "Steel construction norms" gb50755-2012, there should be consistent with existing national standards "Steel Construction Quality Acceptance" gb50205-2001 of. Belonging to one of the following steel, should be carried out in full retest sampling:
① foreign steel imports;
② mixed batch of steel;
③ thickness equal to or greater than 40mm, and the design of the performance requirements z slab;
④ safety rating for a building structure, large span steel structure, the main force of the steel components used;
⑤ steel retest design requirements;
⑥ doubt on the quality of steel.
(3) the requirements of the steel sheet in the thickness direction, z15 grade steel for each inspection lot by the same brand, the same heat, the same thickness, the same delivery shaped steel plates, each batch weighing not more than 25t; z25, z35 grade steel sheet by sheet reinspection.
Standards (4) steel imports reinspection sampling, sample preparation and test methods shall design documents and contract execution. Customs inspection results should be approved by the supervising engineer, later recognized as an effective material retest results.
Welding materials (5) for important welds, or welding material quality certificate document is doubt, should be sampled retest, retest when the wire should press five batches (quite furnace batch) to take a series of tests, the electrode It should be in three batches (quite furnace batch) to take a series of tests.
(6) ordinary bolts as a permanent attachment bolts, when the design document or its quality is doubtful, should be a minimum tensile load bolt physical reinspection, when reinspection each size bolt checks 8.
(7) High strength large hexagon head bolts connecting deputy and torsional shear bolts connecting deputy should each have a torque coefficient and tight coaxial force (Pretension) factory qualified inspection reports, and comes with the box. When the bolts connecting deputy storage time more than six months after use, the relevant requirements should be re-torque coefficient or fastening shaft force test, qualified before use.
(8) high-intensity large hexagonal bolts connecting deputy and torsional shear bolts connecting deputy should individually tightening torque and axial force coefficient (Pretension) reinspection, the test bolt construction bolt batch should be installed on-site at random, 8 sets of connections made each batch extraction retest.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 国内精品自产拍在线观看91 | 精品91自产拍在线 | 日本不卡中文字幕一区二区 | 中文国产成人精品久久一区 | 欧美va在线播放免费观看 | 91麻豆免费 | 国产精品三级国语在线看 | 欧美成人aa久久狼窝动画 | 99成人免费视频 | 深海免费观看完整版正版 | 色久视频| 麻豆精品在线观看 | 二级特黄绝大片免费视频大片 | 日韩精品久久不卡中文字幕 | 欧美高清在线精品一区 | 五月天亚洲婷婷 | 五月婷婷深深爱 | 日韩黑丝 | 欧洲精品一区二区三区在线观看 | 国产欧美在线观看不卡一 | 九九国产 | 影院亚洲 | 欧美日b片 | 岛田阳子五十路在线观看 | 日本黄页网站免费大全 | 色综合久久久久久888 | 亚洲一区二区三区精品国产 | 国内精品伊人久久 | 国产九九视频在线观看 | 国产99视频精品免费视频7 | 欧美日中文字幕 | 四虎海外在线永久免费看 | 久久婷婷国产精品香蕉 | 中文字幕国产在线观看 | 国产精品k| 曰本女人一级毛片看一级毛 | 在线观看一级毛片免费 | 成人香蕉| 亚洲视频一区在线观看 | 免费观看男生自噜视频 | 一区二区中文字幕在线观看 |