日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sowiz.com.cn

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces

Time:[2015-8-1]  Hits:5529

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces


1, the connector bolt hole according to relevant provisions of Chapter 8 of this specification for processing, precision bolt hole wall roughness appearance, diameter and pitch tolerance and so on, Guangzhou steel should be consistent with existing national standards "Steel Construction Quality Acceptance "of the relevant provisions of GB50205.
2, bolt hole pitch over the provisions of this Code section 7.2.1 of the allowable error, the base material can be used to match the welding electrodes, and shall be subject to the system after re-qualified NDT holes, each hole by welding Number of re-drilling must not exceed 20% of the group the number of bolts.
3, high strength bolts conflict face contact surface voids due to the thickness tolerances and other manufacturing error or installation error occurs, provisions for processing in accordance with Table 7.2.3.
4, conflict bolts connecting surface treatment process can be selected at the design according to the requirements of the anti-slip coefficient, anti-slip coefficient should fit the design requirements. When using hand-grinding wheel, grinding direction should be perpendicular to the direction of the force and scope should not be less than 4 times grinding bolt aperture.
5, the high strength bolts connecting process after the appearance of a conflict surfaces, should be consistent with the following provisions:
(1) a connection collision surface should be dry and clean, should not have flash, burrs, weld spatter, burr, iron skin, dirt and so on;
(2) Conflict surface after treatment should take protective measures, shall be marked in conflict face;
(3) Conflict surface with rust treatment, before installation should be fine wire brush perpendicular to the direction of the force member removed rust conflicts surface. Guangzhou Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 韩国一级黄色大片 | 年轻的嫂子在线线观免费观看 | 鸥美性生交xxxxx久久久 | 黄网站在线播放视频免费观看 | 韩日在线播放 | 日本美女一区二区 | 日本亚州视频在线八a | 尹人在线| 日韩三级一区二区三区 | sihu永久在线播放地址 | 欧美三级视频 | 一区二区三区亚洲 | 亚洲欧美日韩在线 | 97在线视频免费观看费观看 | 国产毛片一区二区三区 | 亚洲成人网在线播放 | 欧美日韩色视频在线观看 | 久久99精品国产麻豆 | 国产网站免费观看 | 午夜国产精品免费观看 | 日韩成人免费 | 欧美裸阴| 国产在线精品成人一区二区三区 | 国产一级一级毛片 | 苦咖啡电视剧剧情全集免费 | 污网站在线观看 | 欧美成人看片一区二区三区尤物 | 女教师韩国无删减完整版 | 九九热在线视频 | 欧美日韩高清在线观看 | 四虎影视国产永久免费 | 日韩视频一区二区在线观看 | 天天添天天操 | 永久网站色视频在线观看免费 | 国产欧美亚洲另类第一页 | 最新国产成人盗摄精品视频 | 久久毛片久久毛 | 精品一区二区在线欧美日韩 | 日本中文字幕第一页 | a爱爱视频 | 华人91视频 |