日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sowiz.com.cn

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces

Time:[2015-8-1]  Hits:5756

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces


1, the connector bolt hole according to relevant provisions of Chapter 8 of this specification for processing, precision bolt hole wall roughness appearance, diameter and pitch tolerance and so on, Guangzhou steel should be consistent with existing national standards "Steel Construction Quality Acceptance "of the relevant provisions of GB50205.
2, bolt hole pitch over the provisions of this Code section 7.2.1 of the allowable error, the base material can be used to match the welding electrodes, and shall be subject to the system after re-qualified NDT holes, each hole by welding Number of re-drilling must not exceed 20% of the group the number of bolts.
3, high strength bolts conflict face contact surface voids due to the thickness tolerances and other manufacturing error or installation error occurs, provisions for processing in accordance with Table 7.2.3.
4, conflict bolts connecting surface treatment process can be selected at the design according to the requirements of the anti-slip coefficient, anti-slip coefficient should fit the design requirements. When using hand-grinding wheel, grinding direction should be perpendicular to the direction of the force and scope should not be less than 4 times grinding bolt aperture.
5, the high strength bolts connecting process after the appearance of a conflict surfaces, should be consistent with the following provisions:
(1) a connection collision surface should be dry and clean, should not have flash, burrs, weld spatter, burr, iron skin, dirt and so on;
(2) Conflict surface after treatment should take protective measures, shall be marked in conflict face;
(3) Conflict surface with rust treatment, before installation should be fine wire brush perpendicular to the direction of the force member removed rust conflicts surface. Guangzhou Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 69视频在线观看高清 | 天堂网在线观看在线观看精品 | 一本大道无香蕉综合在线 | 久久久免费观看视频 | 亚洲欧美日韩综合二区三区 | 日韩性大片免费 | 色欧美综合 | 青青草原网址 | 欧美成人亚洲高清在线观看 | 四虎国产永久在线精品免费观看 | 欧美成人自拍视频 | 91极品尤物 | 最新国产一区二区精品久久 | 欧美国产精品不卡在线观看 | 国产大毛片 | 一区视频在线播放 | 久草国产在线视频 | 亚洲国产精品激情在线观看 | 国产女人又爽又大 | 亚洲一级片网站 | 国产亚洲综合精品一区二区三区 | 在线播放国产不卡免费视频 | 青青青爽在线视频观看大全 | 青青青视频在国线观看伊人 | 久久综合久久网 | 国产在线精品一区二区中文 | 国产福利片在线观看 | h免费看 | 日本特黄视频 | 99热在线精品免费播放6 | 日韩不卡在线视频 | 午夜国产羞羞视频免费网站 | 国产成人亚洲综合91精品555 | 国产人成午夜免费噼啪视频 | 色视频免费观看 | 国内精品久久久久香蕉 | 国产伦理久久精品久久久久 | 日本精品久久久久中文字幕2 | 成人欧美视频在线观看 | 欧美成人黄色片 | 99久久99久久精品国产 |