1. Steel parts and steel components processing requirements

Time:[2015-2-28]  Hits:4984

1. Steel parts and steel components processing requirements:
  Cutting surface or cut surface of steel, should be no cracks, slag, stratification and greater than 1 mm of missing edge, should fully checked.
Carbon structural steel at ambient temperature is below -16 ℃, low-alloy structural steel at ambient temperature is below -12 ℃, not cold cold bending and straightening.
Steel surface after the correction, there should be a clear concave or damage, scratches depth of not more than 0.5mm, and should not be greater than the thickness of the steel allows negative deviation 1/2.

2. Steel welding requirements:
  (1) Welder
  Engaged in steel welders welding work must obtain a certificate and pass the examination. Welders welding must pass the examination within its scope the project and recognized.
  (2) Non-destructive testing
  Design requirements for full penetration of the primary and secondary weld ultrasonic testing should be used to check the internal defects, ultrasonic testing can not judge when the defect should be used radiographic inspection, and testing its internal defect classification methods should be consistent with existing national standards regulations.


3. Fasteners Requirements:
  Steel production and installation of units should be required strength bolts were even anti-slip friction coefficient test and retest the surface, the friction surfaces of the scene should be a separate component for anti-slip coefficient test results should meet the design requirements.


4. Steel and steel component assembly installation requirements:
  (1) H-beam flange plate welded seam and web seam spacing of not less than 200 mm.
  (2) cranes and crane girder trusses in place after installation should not be under the scratch.
  (3) multi-section column installation, locate the axis of each section of the column should be drawn directly on the ground to control the axis, the axis must not lead from the lower column, to avoid excessive accumulation of errors.
  (4) After completion of the steel truss structure and the overall fight after completion of the roof should be separately measured deflection, deflection, and the measured value shall not exceed 1.15 times the corresponding design values.
  (5) paint, painting several times, coating thickness shall meet the design requirements.
  (6) a thin coating fireproof paint coating thickness shall comply with the relevant requirements of the fire resistance design.


5. Steel Division project completion and acceptance requirements.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 一级做性色a爱片久久片 | 两个人的视频在线免费观看 | 亚洲激情视频在线 | 男女做性免费视频软件 | 狠狠色丁香婷婷综合激情 | 四虎免费在线播放 | 香蕉视频网站免费观视频 | 国产一区 在线播放 | 一级特黄aaa免费 | 国产片在线观看播放 | 国产精品综合一区二区三区 | 片成年免费观看网站黄 | 第三人称复仇韩剧在线观看免费 | 精品麻豆国产 | 亚欧在线免费观看 | 国内精品久久久久久久影视麻豆 | 三面娜迦免费观看 | 亚洲国产精品毛片∧v卡在线 | 一级做性色a爱片久久片 | 一区三区三区不卡 | 91网站在线免费观看 | 国产麻豆 | 老外黑人一级毛片 | 在线观看国产免费高清不卡 | 加勒比一道本综合 | 美女无遮挡拍拍拍免费视频 | 麻豆tv在线观看 | 婷婷色香五月激情综合2020 | 日韩精品福利视频一区二区三区 | 久久免费精品 | 亚洲天堂2016 | 国产v片在线播放免费观 | 日本爽视频 | 在线视频亚洲 | 亚洲伦理中文字幕 | 国产精品不卡无毒在线观看 | 国产区香蕉精品系列在线观看不卡 | aaa在线观看视频高清视频 | 国产青青视频 | 久久伊人操 | 欧美中文一区 |