日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > Foshan Steel: steel structure fire retardant paint coating application methods Introduction
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sowiz.com.cn

Foshan Steel: steel structure fire retardant paint coating application methods Introduction

Time:[2015-1-17]  Hits:5339

Foshan Steel: steel structure fire retardant paint coating application methods Introduction

Different fireproof paint coating method is slightly different, but the basic coating process is similar. Below TN-LG fireproof coatings to illustrate the technical requirements of fireproof paint coatings.
TN-LG is a modified high temperature inorganic binder with expanded vermiculite, perlite and other heat-absorbing, heat insulation and fire protection coating material to enhance a chemical additives and synthetic materials.
(1) before painting steel components should be thoroughly rust treatment, it is best to brush the rust, so as not to appear and there will be a new rust before spraying fire retardant paint, should remove surface dust and dirt before spraying.
(2) coating the ambient temperature should be maintained at above 0 ℃, no drafts.
(3) the use of spray paint spraying equipment, each coating thickness of 5 ~ 10MM, separated by a 2 ~ 8H spraying until the required thickness so far, local repair manual wiping available.
(4) two-component coating, according to the ratio requirements before spraying the A, B two components deployed evenly. When deployed, the first dilute material into the mixer mixing 3 ~ 5MIN, then pour in the powder, such as 20 ~ 26KG mixing the material to the desired consistency can be sprayed.
Note: The painting should pay attention to this kind of two-component coating after mixing, paint curing faster, mixing time should be controlled within 10MIN, stirring after spraying within 20MIN, high summer temperatures should be faster.
(5) prepare cured and maintenance. Just spray the coating should avoid rain shower, room temperature coatings cured within 48 ~ 96H.
(6) paint stored at 4 ~ 40 ℃, not on the outside storage or exposure to the sun. Paint is valid for six months.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 久久99精品视香蕉蕉 | 亚洲一级毛片视频 | 4hu四虎最新免费地址 | 123日本不卡在线观看 | 日本高清视频在线播放 | 麻豆制片厂制作传媒在现观看 | 欧美成人自拍视频 | 久久视精品 | 在线观看黄台的免费视频 | 国产中文字幕第一页 | 99久久精品无码一区二区毛片 | 国产成人亚洲综合欧美一部 | 最新亚洲人成网站在线影院 | 欧美人与禽zzz000xxx | 国产成人欧美一区二区三区的 | 视频亚洲一区 | 男女免费高清在线爱做视频 | 日韩欧美一区二区在线观看 | 欧美视频精品在线 | 国产91中文剧情在线观看 | 日韩黄色在线播放 | 九一色视频 | 日韩一区二区三区在线免费观看 | 日日射天天干 | 六月婷婷开开放处 | 欧美人体在线 | 一级做性色a爰片久久毛片免费 | 久色中文 | 人成午夜免费大片在线观看 | 性福宝8008 | 亚洲尹人九九大色香蕉网站 | 免费国产一级特黄aa大 | 日日爱爱 | 欧美一区二区三区gg高清影视 | 男女免费观看视频 | 日韩视频免费在线播放 | 欧美在线看欧美高清视频免费 | 久久九九免费视频 | 97精品国产高清在线看入口 | 色噜噜狠狠狠综合曰曰曰 | 亚洲痴汉 |