Control of welding process elements in steel structure design engineering

Time:[2022-10-19]  Hits:2044

The steel structure planning project has extremely high strength, and better construction effect can be achieved when the plant floor is higher or the span is larger. However, many actual constructors in our country know little about the steel structure project, so they can't really grasp the welding key of the steel structure planning project, which has a certain impact on the final quality of the steel structure project. Therefore, in order to improve the construction quality of steel structure planning and construction, it is necessary to strictly control and control the welding part of the steel structure project to ensure the quality of the steel structure planning project and promote the continuous updating of the construction profession and construction skills.


1. Control of process factors


1.1 Control of pre welding preparation of steel structure planning project


Preparation before welding of steel structure planning mainly refers to groove preparation, welding equipment and cleaning of welding area.


(1) Preparation of groove: the processing of welding groove directly affects the quality of welding operation, so it should be operated strictly according to the steel structure planning process; Attention shall also be paid to the fact that the raw materials, specifications and types of the arc tab groove of the steel structure planning shall be the same as those of the base metal.


(2) Welding device: the device quality not only affects the dimensions of the steel structure planning components, but also has a certain impact on the weld formation. When welding the device, it is necessary to consider whether it is easy to weld after the device. If the device affects the normal welding of individual steel structure planning welds, it is necessary to weld this weld before installing other parts. All welding materials of the device shall match with the base metal, and the spot welding height shall not exceed 2/3 of the planned weld height of the steel structure.


(3) Cleaning of planned welding area of steel structure: oil stain, rust, dust, etc. on both sides of the joint shall be completely removed to prevent blowholes and cracks in the planned weld of steel structure.


1.2 Control of welding sequence


Selecting a reasonable welding sequence for steel structure planning can reduce the deformation degree of components and prevent the occurrence of cracks. Therefore, when selecting the welding sequence for steel structure planning, the welding seam should be in a relatively free shortening state as far as possible. The welding seam with a large shortening amount should be welded first, and then the welding seam with a small shortening amount, so as to ensure that the planned welding seam of steel structure has a large shortening freedom during welding and a small planned residual stress of steel structure occurs.


1.3 Control of welding process specification parameters


The welding process specification parameters of steel structure planning mainly include welding specification parameters, preheating temperature, post heat and hydrogen elimination treatment, post weld heat treatment, etc. The welding specification parameters are clearly specified in the process, and the steel structure planning workers should strictly follow the process. The selection of welding current and arc voltage for steel structure planning shall be emphasized. The current is too small and the arc is unstable, which is easy to cause slag inclusion, incomplete penetration and other defects; If the current is too large, undercut, air hole, welding and other defects are easy to occur, and they are added together by splashing. Long arc means high arc voltage, unstable arc burning, spatter addition, small penetration, and external air intrusion, which constitute the defects of air hole incomplete penetration.

 


The steel structure planning project is widely used in industry and public construction, and the welding process is the key process in the steel structure processing and manufacturing. Strengthening the quality control of the welding process can not only improve the quality of steel structure planning products, but also have a very important effect on the quality of the entire steel structure planning project. Based on this, this paper mainly discusses the key points of welding quality control in steel structure planning project.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 搓逼视频 | 精品国产免费观看一区高清 | 久久精品国产99国产精品小说 | 日本亚州视频在线八a | 另类专区另类专区亚洲 | 欧美日韩成人在线观看 | 花季传媒v3.0.3| 99re只有精品 | 欧美一级欧美一级在线播放 | 三级网址在线播放 | 国产精品欧美久久久久天天影视 | 91热久久免费频精品黑人99 | 全日本爽视频在线 | www.av视频在线观看 | 好好的日视频www | 国产快播 | 国产成人综合在线观看网站 | 国产精品福利网站 | 成人97在线观看免费高清 | 久久99视频精品 | 成人在线免费播放 | 爱婷婷网站在线观看 | jiuseav| 亚洲国产欧洲 | 9cao视频精品 | 欧美 日韩 中字 国产 | 小泽玛利亚久久一区二区三区 | 国产三级精品久久三级国专区 | 99久久久久国产精品免费 | 99热这里只有精品7 99热这里只有精品6免费 | 黑人与欧洲性大战 | 免费日韩在线视频 | 妈妈的朋友伦理在线观看 | 国产视频首页 | 日本最大色倩网站www | 成人午夜动漫在线观看 | 韩国a级毛片 | 91视在线国内在线播放酒店 | 日韩欧美成人免费中文字幕 | 天天上天天操 | 99久久久国产精品免费播放器 |