日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > Problems needing attention in the process of steel structure construction
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sowiz.com.cn

Problems needing attention in the process of steel structure construction

Time:[2022-8-29]  Hits:2227

The steel structure construction project has become more and more popular in recent years, and the problems to be paid attention to in the construction process are particularly important. Generally, many safety problems can be avoided only by the following points. Next, I'll talk to you.

 

First, the size of reinforcement holes shall be reserved before and after construction


In particular, the holes on the section steel can be as small as possible, so that the steel can have good strength. In addition, the loss of profile steel shall be reduced to facilitate construction. In addition, when drilling the steel structure, the two symmetrical sides of the reinforcement shall be taken into account. It is particularly noted that the edge of the reinforcement with a diameter greater than 25mm may increase the diameter of the reinforcement by 1 ~ 2mm.


Second, the position of reinforcement holes must be reserved in advance


When drilling, the upper, lower, left and right positions shall be aligned accurately, otherwise it will be very difficult to pass through the reinforcement. If the information of the construction party responsible for the construction of section steel is inconsistent with that of the civil construction party in the practice of steel structure construction, the two parties need to communicate in time during the construction process.


Third, installation details of bottom steel column


If the embedded steel column at the bottom is light, we can use machinery for lifting, and manual position calibration can be done. This has many advantages.


First, the accuracy of the mounting position can be ensured; Second, because the component processing plant has completed the foundation fabrication of the steel column, the center of the profiled steel column and the center of the base plate must be coincident during fabrication, so the corresponding outer contour is parallel; Third, use the tower crane or other auxiliary installation machinery to lift the foundation embedded column, and then slowly lower the foundation embedded column. In this way, the four corners of the column base plate are aligned with the contour line, and the base plate of the column base is on the mat. Striking while the iron is hot will save time and labor, and can greatly improve the progress of the steel structure construction.


In addition, we can calibrate the position of the foundation embedded column with the help of two theodolites. Then fix the two theodolites on the vertical and horizontal axes of the column, and then move the position of the column to make the front center line of the column coincide with the viewpoint of the two theodolites, which can ensure the verticality of the column.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 欧美一进一出抽搐大尺度视频 | 91福利精品老师国产自产在线 | 不卡一区在线观看 | www.com91| 亚洲国产精品免费在线观看 | 99爱在线视频这里只有精品 | 一区二区三区四区国产精品 | 久久99久久99精品免费看动漫 | 亚洲综合网在线观看 | 中文字幕不卡在线 | 隔壁老王国产精品福利 | 最新69国产成人精品视频69 | 麻豆免费观看视频 | 成人黄色在线 | 日韩影视在线观看 | 久热国产在线视频 | 韩国一级特黄清高免费大片 | 日本亚洲高清乱码中文在线观看 | 九九久久国产精品免费热6 九九久久国产精品 | 四虎影院永久免费 | 三级在线观看视频 | 亚洲精品 国产 日韩 | 欧美成人亚洲国产精品 | 国产精品国产三级国产专区5o | 在线观看麻豆国产精品 | 2021久久最新国产精品 | 亚洲十八 | 亚洲视频免 | 九九热这里只有精品6 | 日本高清色www网站色 | 日韩永久在线观看免费视频 | 欧美巨大精品欧美一区二区 | 久久精品一区二区国产 | 亚洲精品免费在线观看 | 亚洲成人综合在线 | 久久精品免费观看视频 | 免费高清不卡毛片在线看 | 9色在线视频 | 免费精品一区二区三区在线观看 | 欧美日韩视频二区三区 | 欧美va在线播放免费观看 |