Home > News > Problems needing attention in the process of steel structure construction
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sowiz.com.cn

Problems needing attention in the process of steel structure construction

Time:[2022-8-29]  Hits:2434

The steel structure construction project has become more and more popular in recent years, and the problems to be paid attention to in the construction process are particularly important. Generally, many safety problems can be avoided only by the following points. Next, I'll talk to you.

 

First, the size of reinforcement holes shall be reserved before and after construction


In particular, the holes on the section steel can be as small as possible, so that the steel can have good strength. In addition, the loss of profile steel shall be reduced to facilitate construction. In addition, when drilling the steel structure, the two symmetrical sides of the reinforcement shall be taken into account. It is particularly noted that the edge of the reinforcement with a diameter greater than 25mm may increase the diameter of the reinforcement by 1 ~ 2mm.


Second, the position of reinforcement holes must be reserved in advance


When drilling, the upper, lower, left and right positions shall be aligned accurately, otherwise it will be very difficult to pass through the reinforcement. If the information of the construction party responsible for the construction of section steel is inconsistent with that of the civil construction party in the practice of steel structure construction, the two parties need to communicate in time during the construction process.


Third, installation details of bottom steel column


If the embedded steel column at the bottom is light, we can use machinery for lifting, and manual position calibration can be done. This has many advantages.


First, the accuracy of the mounting position can be ensured; Second, because the component processing plant has completed the foundation fabrication of the steel column, the center of the profiled steel column and the center of the base plate must be coincident during fabrication, so the corresponding outer contour is parallel; Third, use the tower crane or other auxiliary installation machinery to lift the foundation embedded column, and then slowly lower the foundation embedded column. In this way, the four corners of the column base plate are aligned with the contour line, and the base plate of the column base is on the mat. Striking while the iron is hot will save time and labor, and can greatly improve the progress of the steel structure construction.


In addition, we can calibrate the position of the foundation embedded column with the help of two theodolites. Then fix the two theodolites on the vertical and horizontal axes of the column, and then move the position of the column to make the front center line of the column coincide with the viewpoint of the two theodolites, which can ensure the verticality of the column.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 美女视频永久黄网站免费观看国产 | 三级成人网| 狠狠色网站 | 国产一卡二卡三卡四卡 | 欧美高清360 | 欧美日韩成人在线观看 | 在线观看免费午夜大片 | 国产精品日本不卡一区二区 | 人人入人人 | 国精品日韩欧美一区二区三区 | 一级毛片在线 | 久久久国产成人精品 | 五月天最新网站 | 一本久久精品一区二区 | 欧美一区二区免费 | 久久精品导航 | 国产成人精品亚洲日本在线 | 青青草97| 狠狠操社区 | 中文字幕日韩wm二在线看 | 亚洲视频在线一区二区 | 91亚洲专区 | 毛片精品 | 婷婷综合国产激情在线 | 欧美日韩一区二区亚洲 | 99国产精品国产精品 | 欧美中文在线视频 | 日韩欧美国产偷亚洲清高 | 91av国产视频 | 黄频网站 | 国产精品久久久久久久久久妇女 | 国产欧美一区二区精品性色 | 91视频一区二区三区 | 花季v3.351| 99精彩免费观看 | 久久成人永久免费播放 | 四虎影院在线免费 | 免费观看国产一区二区三区 | 国产精品国产三级国产an不卡 | 热久久这里是精品6免费观看 | 香蕉tv亚洲专区在线观看 |